H145 Final Drive Parts


NISMO H145 Limited Slip Diff

B10. B110. B210( -74/8).

Form PARTS No. Unit
price
Offset A size B size Side gear
SERESHON
Pinion Mate
GearNumber
Bolt Drive Gear
Size (number)
H145 38420-H1020 Sold out 27 69.85 95 22x21T 4 M10x1.25(8)


H145 L.S.D. Parts
No PARTS No. DESCRIPTION Unit price Thickness Number
2 38433-H0120 Disc Friction Sold out 1.5 2
1 38432-H0120 Plate Friction Sold out 1.5 2
38432-H0121 1.45
38432-H0122 1.55
3 38435-H0120 Plate Spring Friction Sold out 1.5 2
4 38434-H0120 Disc Spring Friction Sold out 1.5 2



H145 Gear Set Hypoid
Gear ratio B10 B110 - B210
3.900 - - - 38100-H1000
4.111 - 38300-18000 - 38100-H1100
4.375 -. 38300-18100 - -
- 38300-H0700 - 38100-H0700
4.625 - 38300-15400 - -
- 38300-G0400 - 38100-G0400
Gear Carrier 38310-18000 38310-G0400


H145 Diff Parts (Up to '74-8)
Parts PARTS No. Price Quantity
Gasket Gear Carrier 38320-18010 Sold out -
Pitroad 1.200 yen x 1
Bolt DriveGear 38102-G0300 Sold out x 8
NUT 38216-18000 Sold out x 1
Flange Assy Companion 38210-18000 Sold out x 1
Seal Oil Drive Pinion 38189-18000 Sold out x 1
Bearing Pinion Front 38140-18000 4.840 yen x 1
Spacer Pinion Bearing 38165-H1000 1.910 yen x 1
Bearing Pinion Rear 38120-18000 2.540 yen x 1
Bearing Diff Side 38440-H1000 Sold out x 2
Pitroad 2.750 yen
. . . .
t=2.74 Washer Adjust Drive Pinion 38154-G0400 Sold out x 1
t=2.77 -G0401
t=2.80 -G0402
t=2.83 -G0403
t=2.86 -G0404
t=2.89 -G0405
t=2.92 -G0406
t=2.95 -G0407
t=2.98 -G0408
t=3.01 -G0409
t=3.04 -G0410
t=3.07 -G0411
t=3.10 -G0412
t=3.13 -G0413
t=3.16 -G0414
t=3.19 -G0415
t=3.22 -G0416
t=3.25 -G0417
. . . .
t=0.05 Shim Adjust Side Bearing 38453-H1000 Sold out x 1
t=0.07 38454-
t=0.10 38455-
t=0.20 38456-
t=0.50 38457-



The goods with which the price list is being underlined with the cancellation line are production abolition.

There are many cases of price change without a preliminary announcement.

When there is no stock in the Nissan parts, manufacture is begun after receiving an order.
It requires in many cases for three months from two months by delivery of goods.
Even in this case, payment is required at the time of an order.